




This bonus room re-design has been our over Christmas project. The room is going to have a pool table in it, and is to have an overall Duke theme. We have incorporated stone to look like Cameron Indoor Stadium, a Duke colored backsplash and accent wall. As you can see these photos are in the stages where everything is being done: trim work, paint, stone installed, tile installed, all the electrical being re-worked and everything being ripped out. The bottom picture is what the room looked like before and in a few days I should have a few after photos........ to be continued!!!
No comments:
Post a Comment